EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
bhoward
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (101)
Research
Workshop
Empennage
- (81)
-
Finished last rivets...
-
Actually riveted the...
-
More rolling on the...
-
Rolled the leading edge
-
Riveting the...
-
Record keeping
-
Set a few rivets
-
Riveted the...
-
Finished the rudder...
-
Started building...
-
Rudder trailing edge...
-
Started building the...
-
Installed stiffeners
-
Match drilled...
-
Finished stiffeners
-
Rudder stiffeners #2
-
Trim cover plate
-
Removed flange on h...
-
Installed rod end...
-
Rolled leading edge
-
Finished trim tab
-
Riveted the tab and...
-
Finished prepping...
-
Drilled the tab spar
-
Continuing trim tab
-
Completed the...
-
Riveted the left...
-
Riveted the counter...
-
Riveted the elevator...
-
Bender the elevator...
-
Preparing the trim spar
-
Deburred and dimpled...
-
Finished drilling...
-
Completed the right...
-
Riveted the skeleton...
-
Finished left...
-
E709 prep- left...
-
Left elevator prep
-
Drilling counter...
-
Working doublers and...
-
Bent trailing edge...
-
Drilled and back...
-
Finished stiffeners
-
Started elevator -...
-
Riveted vert stab...
-
Riveted the vert...
-
Clecoed the vertical...
-
Finalized drilling...
-
Drilled the vertical...
-
Continuing the...
-
Building the rudder...
-
Fitting the...
-
Fitting the...
-
Fitting the...
-
Drilling the V Stab
-
Drilling the V Stab
-
Riveting the H Stab
-
Riveting the H Stab
-
Riveting the H Stab
-
Riveting the H Stab
-
Riveting the H stab
-
Riveting the H Stab
-
Riveting the H Stab
-
Riveting the H-Stab
-
Preparing parts for...
-
Drilling the H Stab
-
Drilling the H stab
-
Drilling the H Stab
-
Drilling h stab
-
Preparing ribs
-
HS-411 assembly
-
Preparing ribs
-
Match drilling
-
HS710
-
Match Drill Doublers
-
Front Spar
-
Front Spar
-
Elevator hinge brackets
-
Prepared HS-609PP
-
Prepare HS-609PP
-
Received and...
Fuselage
Firewall
Tail Feathers
Wings
- (20)
-
Fitted and drilled...
-
Riveted left wing...
-
Competed demurring
-
Fitted and drilled...
-
Prepare wing ribs
-
Rivet rear spar...
-
Prepared the W-707G...
-
Prepped rear spar
-
Installed tie-down...
-
Fitted tie-down on...
-
Create W726
-
Spot prime and...
-
Attach nut plates
-
Finish counter sink...
-
Counter sink for nut...
-
Attach nut plates
-
Finish counter sink...
-
Counter sink for nut...
-
Identification of...
-
Received shipment of...
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
Brian Howard
-
Project:
Vans - RV-7A
-
VIEW REPORTS
Total Hours:
322
Total Flight Time:
Total Expense:
$11440.00
Start/Last Date:
Oct 27, 2021 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=bhoward
Home or Last Project Picture
Apr 30, 2022
Record keeping
- (2 hours)
Category: Empennage
Updated this site from notes on the plans I take while building. Attached are images of the plans and dates. Getting worried about damaging the notes as there is already water damage due to other work happening in my shop.
86517A23-F7E9-4B9C-ACE7-BF832738872B.jpeg
494AF6AA-E15E-45D7-8079-EC8103A1F88E.jpeg
4A517175-E8C4-4B4B-A482-9960210886CA.jpeg
CF7BC2AB-9012-46FF-8087-6E6A9587EE86.jpeg
477FB58D-7842-4E64-8C78-228F2A7BCD5C.jpeg
651FC9BC-5DD0-4018-AB8A-6D6A7DF91997.jpeg
F8529EE5-54FA-4C09-A233-88751508E0DE.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.